← All terms

Glossary · Energy industry & energy transition

Inside Information in the Energy Market

Inside information, in German Insiderinformation or Insider-Information, is information in the energy market that is precise and not publicly known. It relates, directly or indirectly, to one or more wholesale energy products. If it were made public, it would be likely to have a significant effect on their prices. The term comes from the European Regulation (EU) No 1227/2011, known as REMIT, on wholesale energy market integrity and transparency. It applies directly in all EU Member States and concerns above all wholesale trading in electricity and natural gas. Regulation (EU) 2024/1106, often called REMIT II, amended it significantly in 2024.

The four elements of the definition

Information is inside information only if all elements are met at the same time:

  • Precise: The information concerns a circumstance that has occurred or is sufficiently likely to occur. It is specific enough to allow a conclusion about a possible price effect. The technical cause does not yet have to be clarified. A confirmed fault with an estimated outage duration may already be enough.

  • Non-public: The information has not yet been made available to the market.

  • Relation to wholesale energy products: It concerns, directly or indirectly, wholesale products for electricity or gas. These include, for example, spot and forward contracts as well as transport capacity.

  • Significant price relevance: If published, the information would be likely to have a significant effect on prices. Whether the price actually moved later is not decisive. The assessment is made from the perspective at the time the information becomes available (ex ante).

The Regulation also specifies which types of information are meant. These include information that must in any case be published under the European electricity and gas market regulations, together with guidelines and network codes. Also expressly named is information on the capacity and use of facilities for the production, storage, consumption or transmission of electricity or natural gas, as well as of LNG facilities. This includes planned and unplanned unavailabilities. Typical examples are the unplanned outage of a large power plant unit, a postponed return to service, reduced capacity at cross-border interconnectors, restrictions at gas storage facilities, or disruptions at LNG terminals. Since REMIT II the following also applies: an intermediate step in a protracted process can itself be inside information if it meets the criteria. One example is a multi-stage decision on the decommissioning of a facility. The definition was thereby aligned with financial market law, that is, with the Market Abuse Regulation (MAR).

Technical quantities and market situation

Inside information is not a physical quantity, but it is usually based on technical indicators. These include the unavailable capacity in megawatts, the affected amount of energy in megawatt-hours, the start and expected end of a disruption, the location of the facility, or the transport capacity between two bidding zones. REMIT does not set a fixed Europe-wide capacity threshold above which information is automatically price-relevant. Whether information is significant depends on the individual case. The outage of a 50-megawatt unit has a different effect from the outage of several hundred megawatts. And the same outage may hardly be noticeable in a windy midday hour, yet be clearly felt in a cold, low-wind evening hour with high residual load. Size, timing, duration, grid situation, import options and available flexibility must therefore be considered together.

Distinction from analysis, trading plans and rumours

Not every piece of internal knowledge is inside information. Anyone who evaluates publicly available weather forecasts, power plant statistics or transparency data faster or better makes use of a permitted analytical advantage. According to the recitals of REMIT, a market participant's own trading plans and strategies are likewise not inside information. The situation is different if a company knows that its own facility is failing unexpectedly and this fact has not yet been published. This advantage then arises not from analysis but from exclusive access to a price-relevant fact. An unconfirmed rumour is generally not precise enough. However, if it is confirmed internally or becomes concrete through operating data, the assessment may change.

Why information takes effect so quickly in the electricity market

In the electricity market, generation and consumption must be balanced at every moment. If capacity fails or transmission capacity is reduced, the expected scarcity for certain hours changes immediately. This shows in prices on the day-ahead market, in intraday trading and on the forward market. A line restriction changes the trading possibilities between bidding zones, and a power plant outage shifts the dispatch order of the remaining plants. Anyone who learns of this earlier therefore knows not just a technical state but a likely price impulse. They could buy electricity or close sell positions before the market reacts. This is precisely what the regulation is meant to prevent.

Publication obligation under Article 4 REMIT

Market participants must publish inside information effectively and in a timely manner. This concerns information about businesses or facilities that they, their parent undertaking or a related undertaking own or control in whole or in part, or for whose operation they are responsible. Since REMIT II, applicable from 7 May 2024, it is expressly required that publication take place via inside information platforms. These Inside Information Platforms (IIPs) require authorisation by ACER under the new framework. The platform must make the information available in such a way that the public can access it quickly and assess it completely, correctly and in a timely manner, for example via a website or an application programming interface. In Germany, ACER and the Bundesnetzagentur have required since 1 January 2021 that such platforms be used. Publication only on the company's own website or on social networks has no longer been sufficient since then. According to older guidance from the Bundesnetzagentur, publication must take place without undue delay, at the latest one hour after the triggering event.

Transparency data and inside information are related but not the same. Anyone who publishes information under the transparency rules for electricity and gas is, under the amended version of REMIT, deemed to have published it effectively. However, this does not automatically also satisfy the obligation of timely and public disclosure. The earlier, more lenient rule, under which such publication counted as simultaneous, complete and effective disclosure, is thus obsolete.

In exceptional cases, a market participant may delay publication on its own responsibility (Article 4(2) REMIT). The prerequisites are that publication could harm its legitimate interests, that the public is not misled, and that confidentiality is maintained. The delay must be notified to ACER and the competent national regulatory authority without delay, together with the reasons. As long as the information has not been published, the market participant must also not trade on the basis of it.

Prohibition of insider trading

Article 3 REMIT prohibits persons in possession of inside information from doing three things: first, trading, or attempting to trade, in the wholesale energy products concerned, for their own account or for the account of others. Second, disclosing the information, unless this takes place in the normal course of their employment, profession or duties. Third, inducing others to buy or sell on the basis of the information. Since REMIT II, amending or cancelling an order placed earlier is also expressly treated as insider trading if it is based on inside information. Market manipulation (Article 5) is to be distinguished from this. It refers to conduct that gives false or misleading signals about supply, demand or prices. Both may coincide, but legally they are separate offences.

Supervision and corporate practice

At European level, ACER monitors the market. Since REMIT II, ACER has additional investigative powers in cross-border cases and is to operate a central electronic access point for published inside information. In Germany the Bundesnetzagentur is responsible, together with the Market Transparency Unit for Wholesale Trading in Electricity and Gas (Markttransparenzstelle) established at the Bundesnetzagentur. For companies this means that operations, the legal department and trading must work closely together. A technical fault is at first merely an operational event. If it meets the criteria of inside information, it must be assessed quickly, published via an IIP, and until then shielded from trading. Unclear responsibilities can thus lead to a breach even without intent.

Assessment

Insider regulation does not require all market participants to know everything. A market can also function with uncertainty. However, it limits the advantage derived from non-public, price-relevant facts, so that prices reflect expectations about scarcity, costs and risks rather than privileged access to operating data. With more weather-dependent generation, storage and cross-border trading, prices react more strongly to short-term availability. Timely and simultaneous publication therefore becomes more important. The term marks the boundary between a permitted advantage from one's own analysis and a regulated informational advantage from exclusive access to market-relevant facts.

Sources

Related glossary entries

Edited by eCMS on 28.11.2026 12:01

© 2026 Erik Schmidt. All rights reserved. Quotations with a link to the source are welcome.