Glossary · Energy industry & energy transition
IEC 61850
IEC 61850 is an international series of standards from the IEC. The German version is titled „Kommunikationsnetze und -systeme für die Automatisierung in der elektrischen Energieversorgung“ (communication networks and systems for power utility automation). It was originally developed for the automation of switchgear in a substation. Today it also covers power plants, wind farms, distribution grid automation and distributed energy resources. The core idea of the series: devices and functions in the power grid are described in such a way that devices from different manufacturers understand, engineer and operate them in the same way.
IEC 61850 is not a single communication protocol. The series defines data models, as well as abstract communication services, a language for device descriptions and engineering files, and requirements for testing. These abstract models are then mapped to concrete transmission methods. In practice, three of them are particularly important: MMS for data exchange between client and server, for example between a protection device and the substation control system; GOOSE for fast event, trip and interlocking signals; and Sampled Values for continuously digitized current and voltage measurements. IEC 61850 therefore does not simply mean "Ethernet in the substation". Ethernet provides only the transmission. The model defines what the data mean and what function they have.
Structure of the series
The series consists of many parts, which can be roughly arranged in groups:
-
Fundamentals and requirements: introduction, terms, general requirements for devices (such as environmental conditions and electromagnetic compatibility), system and project management, and communication requirements for functions (Parts 1 to 5).
-
Part 6, Substation Configuration Language (SCL): an XML-based language for devices, plant structure and communication relationships.
-
Parts 7-x, information model: abstract services (ACSI), common data classes and Logical Nodes. Part 7-420 exists for distributed energy resources and distribution grid automation.
-
Parts 8-x and 9-x, mapping to concrete protocols: Part 8-1 maps client-server communication to MMS and Ethernet and also governs GOOSE. Part 9-2 describes Sampled Values over Ethernet.
-
Part 10: conformance testing of devices.
The individual parts are continuously revised, supplemented and extended by Technical Reports. One example: Part 7-420 for distributed energy resources was published in its second edition in October 2021. In Germany it has been adopted as DIN EN IEC 61850-7-420:2024-05. Anyone who requires IEC 61850 should therefore always specify which edition of which parts is meant.
Data model and SCL
The centrepiece of IEC 61850 is an object-oriented data model. Devices such as a protection relay, a bay controller or a measuring device do not appear in it as addresses or register lists. Instead, they are described as structured objects with standardized names. The levels are: physical device, logical device, Logical Node, data object and data attribute. One example is the circuit breaker. It is not merely a series of binary signals, but a Logical Node with switch position, commands, timestamp and quality identifier. Further Logical Nodes exist, for example, for protection functions, measurements or transformers. This makes it possible to recognize what a signal means and what role it plays in control and instrumentation technology, protection and automation.
SCL describes devices, data models, communication relationships and plant structure in files that machines can read. There are different file types. Typically, a device file describes what a device can do, and a system file describes the engineered overall plant. The IEC provides machine-readable components of the standard, such as XML schema files and namespace definitions, which tools can use directly. Engineering is thereby not fully automated, but more strongly formalized. This brings great benefit, but often also disappointment: the standard creates a common language. Interoperability, however, does not arise automatically, because design, parameterization and testing remain specialist work.
Station bus, process bus and timing requirements
Substations used to be heavily hardwired. Protection signals, interlockings, measured values and commands ran over copper cables between transformers, switches, protection devices and terminal strips. With IEC 61850, part of this shifts into communication networks. MMS and GOOSE run mainly on the station bus. Over a process bus, so-called merging units can provide the current and voltage values as Sampled Values. The analog transformer circuits then no longer have to be routed individually into each device. This is how digital substations come about.
GOOSE and Sampled Values run on the Ethernet layer as multicast without IP and TCP. This keeps transmission times short. IEC 62351-6 states response times of 3 milliseconds for such Layer 2 applications. Communication time and availability are therefore no side issue in protection technology. Network architecture, redundancy, time synchronization, prioritization and testing must fit the protection concept. A standard-compliant telegram is only useful in operation if it arrives in the right time window, is understood correctly and is integrated into a tested overall concept. IEC 61850 provides the mechanisms but does not replace protection coordination.
Distinction from other protocols and from SCADA
IEC 61850 is often compared with IEC 60870-5-104, DNP3, Modbus or OPC UA. However, these protocols operate on different levels. In Europe, IEC 60870-5-104 is frequently used in telecontrol technology between control centre and station. It works point-oriented: what a value means is usually stated in project-specific address lists. Modbus essentially transmits registers and does not by itself say whether a value is a voltage or a protection message. OPC UA models data in a modern way, but is not designed specifically for protection functions and electrical equipment. IEC 61850, by contrast, combines communication with function models from power engineering. In practice, several protocols exist side by side: the station often works internally with IEC 61850, while a gateway reports data to the grid control centre via IEC 60870-5-104.
SCADA refers to systems that monitor and control technical processes. IEC 61850 can structure communication between field and station devices and towards the control system. However, the series does not replace the control system, operations management or organizational procedures for switching operations or fault analysis.
Significance for distributed energy resources
More and more generation plants, storage systems and controllable loads are being connected to the distribution grid. For this purpose, IEC 61850-7-420 defines information models for distributed energy resources and distribution grid automation. The 2021 edition models every kind of such resource uniformly, including storage systems and controllable loads. It also supports the aggregation of several plants and represents functions from grid connection rules, for example according to EN 50549 or IEEE 1547. This supports security of supply in grids with more power electronics and changing load flows, but does not solve these tasks on its own.
Typical misconceptions
-
Automatic interchangeability: IEC 61850 improves interoperability, but does not make devices arbitrarily interchangeable. Devices may support the same Logical Nodes and still differ in functional scope, parameterization, tools and manufacturer-specific extensions. A device labelled "IEC 61850" may support only MMS and no GOOSE, or vice versa. Tenders must therefore specify functions, services, data objects and test requirements precisely.
-
Costs: Less copper wiring does not automatically mean lower costs. New costs arise for network technology, engineering tools, time synchronization, cybersecurity, test equipment and staff qualification. What matters is the entire life cycle of a plant.
-
Merely digitized signal lists: Anyone who simply transfers old point lists into IEC 61850 forgoes the benefit. It arises only through consistent modelling, uniform names and tests that check the interplay of function, communication and equipment.
-
"Plug and play": Protection and control functions trigger real switching operations and short-circuit disconnections. Every change to parameters, communication relationships or firmware requires release, testing and documentation by the operator.
Cybersecurity and life cycle
In their original form, GOOSE and Sampled Values are not protected against forgery. A device in the same network segment can in principle read, replay or forge such telegrams. The IEC 62351 series adds security mechanisms. Part 3 governs the protection of TCP/IP profiles via TLS, Part 4 concerns MMS. Part 6 secures GOOSE and Sampled Values; the 2020 edition also covers MMS profiles and XMPP. Part 8 governs role-based access rights, Part 9 key management. For time-critical telegrams, authentication via message authentication codes is the main focus. Encryption is often impractical there because of the timing requirements. Technical mechanisms only work together with network segmentation, logging, secure remote maintenance, patch management and emergency plans. This is part of OT security; overarching requirements are described, for example, by IEC 62443.
IEC 61850 also shifts responsibilities. What used to be in switching, terminal and point lists now lies partly in configuration files and engineering databases. Operators must know which file describes the approved state of the plant, which version is running in which device and how changes are documented traceably. Anyone procuring IEC 61850 should demand more than mere standard conformity: supported editions, declarations of conformity, communication profiles, redundancy methods, time synchronization, testability, security functions and long-term support of the tools. Legally, IEC 61850 is a standard and not a law. It becomes binding only through contracts, technical rules or requirements of the grid operator.
At its core, IEC 61850 is thus a common technical language for automated power systems, not a single protocol. Its benefit arises where this language is consistently modelled, tested and mastered over the entire life cycle of a plant.
Sources
- IEC 62351: Cybersecurity for IEC 61850 — IEC (IEC-61850-Informationsportal); unbekannt. Abschnitte Key IEC 62351 Cybersecurity Standards und Additional IEC 62351 Standards
- IEC 62351-6:2020 – Security for IEC 61850 — iTeh Standards (Vorschau der IEC-Norm); 2020. Inhaltsübersicht und Abschnitt 4.1
- DIN EN IEC 61850-7-420:2024-05 — DIN Media; 2024-05. Produktseite, deutscher Titel und Status
- IEC 61850-7-420:2021 – Distributed energy resources and distribution automation logical nodes — en-standard.eu (Wiedergabe der IEC-Normzusammenfassung); 2021-10-13. Abstract und Liste der technischen Änderungen
- IEC 61850 Code Components — IEC (IEC-61850-Informationsportal); unbekannt. Seiteneinleitung
Related glossary entries
- substation
- substation control system
- protection relay
- circuit breaker
- control and instrumentation technology
- protection technology
- redundancy
- protection concept
- IEC 60870-5-104
- DNP3
- telecontrol technology
- SCADA
- distribution grid
- security of supply
- IEC 62351
- OT security
- IEC 62443
Edited by eCMS on 28.11.2026 12:01
© 2026 Erik Schmidt. All rights reserved. Quotations with a link to the source are welcome.