← All terms

Glossary · Energy industry & energy transition

IEC 60870-5-104

IEC 60870-5-104, often abbreviated to "IEC 104", is a standardised communication protocol of telecontrol technology. Control centres and widely distributed technical installations use it to exchange data over IP-based networks. In the power system, it mainly transmits measured values, switch positions, fault messages, counter values and control commands. The communication partners are grid control centres, substations, telecontrol devices (RTUs), gateways and generation plants. The official title translates roughly as "Network access for IEC 60870-5-101 using standard transport profiles". The IEC describes the standard as a companion standard for the interoperability of compatible telecontrol equipment in the monitoring and control of geographically widespread processes.

Edition status and classification

The standard belongs to the IEC 60870-5 series and is maintained by IEC Technical Committee TC 57. The first edition was published in 2000. The edition currently valid is the second edition of 2006 with Amendment 1 from 2016. The IEC offers both as a consolidated version 2.1, which also incorporates a corrigendum of August 2023. Conformance testing is covered by the Technical Specification IEC TS 60870-5-604.

Within the series, IEC 60870-5-101 describes classic serial telecontrol communication. IEC 60870-5-104 largely adopts its application layer and replaces the serial link layer with its own control layer over TCP/IP. In practice, this means that the familiar data types and procedures of telecontrol technology are retained, but are transported over packet-switched networks. TCP port 2404 is provided as the default for this. As a rule, the control centre establishes the connection and the telecontrol device in the station accepts it.

Structure of the telegrams

Each telegram, known as an APDU, begins with a six-byte control part (APCI). It consists of the start byte 68 in hexadecimal, a length field and four control bytes. There are three formats:

  • I-format: It carries user data in the form of an ASDU and bears consecutive send and receive sequence numbers. This makes it possible to detect lost or duplicated telegrams.

  • S-format: It is used to acknowledge received I-telegrams when the remote station has no data of its own to send at that moment.

  • U-format: It controls the connection, for example the start and stop of data transmission or test telegrams for monitoring the connection.

Parameters are defined for flow control. It is common that at most k = 12 I-telegrams may be outstanding unacknowledged and that the receiver acknowledges at the latest after w = 8 received telegrams. In addition, there are timers. If an acknowledgement is missing, the sender disconnects after t1 (typically 15 seconds). Without data of its own, the receiver acknowledges at the latest after t2 (typically 10 seconds), where t2 must be smaller than t1. If the connection is idle for longer than t3 (typically 20 seconds), a test telegram is sent. These are common default settings; they are configured on a project-specific basis. If the values do not match between control centre and station, sporadic connection drops are a typical commissioning problem.

The actual information is contained in the ASDU. It contains a type identification (for example single-point information, measured value or command), the cause of transmission, the common address of the station and the information object address of the individual data point. Depending on the type, quality descriptors and time stamps are added. A measured value is therefore not simply a number here. It is assigned to a data point and transmitted with a cause: spontaneously, cyclically, in response to a general interrogation or as a consequence of a command. Quality bits indicate whether a value is invalid, not topical, substituted, overflowed or blocked. Only this additional information determines whether operating personnel, the grid control system or automation can trust the value. State estimation needs such information, for example, to filter out faulty measurements.

Distinction from related terms

IEC 60870-5-104 is often mentioned together with SCADA. However, SCADA is the superordinate system for monitoring and controlling technical processes, and IEC 104 is only one of the protocols over which it communicates with field devices. Nor is the protocol equivalent to control and automation technology. Control and automation technology includes user interfaces, data models, alarm processing, archiving, grid calculation, authorisations, redundancy concepts and organisational procedures. IEC 104 provides a standardised transmission path for this, but does not replace the overall system.

IEC 61850 is used primarily within substations and additionally defines an object-oriented data model for protection, control and automation functions. IEC 104, by contrast, is geared towards the telecontrol link between station and control centre and works with flat, numerically addressed data points. In many grids, both coexist: IEC 61850 in the station, IEC 104 towards the grid control centre. Gateways translate between them. In doing so, addresses, meanings, quality information and time stamps must be mapped correctly, otherwise hard-to-detect errors arise. DNP3 is functionally related; it is widespread mainly in North America, whereas IEC 104 is used particularly in Europe and many other regions.

IT security

"IP-based" does not mean that the communication runs over the open internet. In professional applications, it usually uses private wide-area networks, MPLS connections, fibre-optic links, mobile networks with closed access points or secured VPN structures. Nevertheless, the change from serial point-to-point connections to IP networks alters the risk situation. IP networks are more flexible and easier to route. However, they create dependencies on network segmentation, firewall rules, addressing, certificate management, patch management and the monitoring of data traffic.

The base protocol itself contains neither encryption nor authentication or cryptographic integrity protection. Anyone who gains access to the communication path can therefore in principle read, modify or replay telegrams. Supplementary protective measures are provided by the IEC 62351 series of standards. IEC 62351-3 secures the transport layer with TLS; port 19998 is frequently used for this. IEC 62351-5:2023 defines an application-layer security mechanism for protocols of the IEC 60870-5 family. It comprises message authentication, session keys and, optionally, authenticated encryption of the application data. How this is implemented concretely in IEC 101 and IEC 104 is described by the Technical Specification IEC TS 60870-5-7:2025. This edition also adds role-based access control according to IEC 62351-8. In practice, such extensions are not available in all legacy devices. Isolated networks, VPNs, firewalls and protocol gateways are therefore still used. A standardised telecontrol connection is thus not automatically a secure one.

Manipulated control commands are not the only danger. Even incorrect measured values or switch positions can lead a control centre to misjudge the grid. If the telecontrol connection fails, an installation usually remains electrically functional. However, it can then only be observed and controlled to a limited extent. Which IT security obligations apply in a specific case does not follow from the standard, but from the respective national law and from the role and size of the operator.

Significance for grid operation

For distribution system operators, IEC 104 is becoming more important because more installations must be observable and controllable. These include decentralised generators, secondary substations, storage, charging infrastructure and larger controllable loads. In the past, these grid levels were often monitored remotely only roughly or not at all. The more grid operation depends on flexibility, redispatch, voltage control and the avoidance of congestion, the more important reliable communication chains become. IEC 104 is a widely used building block here, but does not alone determine controllability. For connecting very many small installations, other routes are also used, such as smart-meter infrastructure or direct marketer interfaces.

Economically, the standard acts mainly through standardisation. Devices from different manufacturers can be connected without proprietary special protocols. This simplifies tenders and keeps existing telecontrol architectures usable for longer. Effort is nevertheless incurred: for parameterisation, maintenance of data point lists, interoperability tests, redundancy, security concepts and protocol converters. The standard permits many options. The parties involved therefore agree in so-called interoperability lists which types, address lengths and functions are actually used.

Responsibility is spread across several actors. Manufacturers supply devices and gateways, system integrators configure them, and grid operators are responsible for safe operation. IT and operational technology often have different requirements for change windows and fault response. A connection can run flawlessly in network terms and still be inadequate for grid control, for example if time stamps are missing, quality descriptors are evaluated incorrectly or command paths are not clearly released.

Dismissing IEC 104 as "obsolete" falls short. Power grids consist of installations with service lives of decades. There, interoperability, manageability, diagnosability and protection count for more than the novelty of a protocol. That the standard continues to be maintained is shown by the 2023 corrigendum and the 2025 security extension. A switch to newer concepts affects control centres, station devices, data models, test procedures and training, and therefore usually proceeds step by step. How good an IEC 104 link is is therefore not shown by successfully transmitted packets. What matters is whether the grid operator receives correct, quality-flagged information in time, can execute commands in a controlled manner and detects communication faults before they lead to wrong decisions.

Sources

Related glossary entries

Edited by eCMS on 28.11.2026 12:01

© 2026 Erik Schmidt. All rights reserved. Quotations with a link to the source are welcome.