A two-sided contract for difference is a support or hedging instrument for electricity generation. A pre-agreed price is compared with a reference price on the electricity market. If the reference price is below the agreed price, the plant operator receives a compensation payment. If it is above, the operator must pay back the difference. In German the instrument is called zweiseitiger Differenzvertrag; in English it is called a two-sided or two-way Contract for Difference, or two-sided CfD for short. In EU documents the abbreviation 2w-CfD is common.

Basic principle and terms

The central price is called the strike price or contract price. In the German support system it corresponds to the anzulegender Wert (the "applicable value"). It is either determined in a tender or set administratively. EU law in principle requires an open, transparent and non-discriminatory competitive procedure. Where that is not possible, the contract and the strike price must be designed so that no undue distortions of competition arise. Possible reference prices include an hourly or quarter-hourly exchange price, a price averaged over a period, or a technology-specific market value. Settlement is in euros per megawatt hour. What matters is therefore not the installed capacity of a plant, but the quantity of electricity to which the contract is applied.

A simplified example: a wind farm has a strike price of 70 euros per megawatt hour. If the reference price in a settlement period is 50 euros, the operator receives 20 euros per megawatt hour. If it is 100 euros, the operator pays back 30 euros per megawatt hour. If the operator sells its electricity at roughly the reference price, it ends up with around 70 euros per megawatt hour in total. Price risk is reduced, but high windfall profits in high-price phases are forgone. If the sales revenue actually achieved deviates from the reference price, the operator continues to bear that deviation itself.

Distinction from related instruments

The sliding market premium, as provided for in the current German EEG 2023, only hedges downside risk. If the market value falls below the applicable value, the difference is compensated. If the market value rises sharply, the operator keeps the additional revenue. The two-sided contract for difference closes this asymmetry through the repayment obligation. In the basic model with a single strike price, the lower and upper limits coincide in that price. However, EU law also permits equivalent variants, such as models with several strike prices, a price floor or a corridor. Between the lower and upper limits, the operator then remains exposed to the market.

The two-sided contract for difference must also be distinguished from the power purchase agreement (PPA). A PPA is a private-law supply or hedging contract between a generator and an offtaker, often an industrial company or trader. A CfD is generally a purely financial settlement with a state or state-appointed counterparty. The operator continues to sell its electricity itself on the market, for example via direct marketing. In addition, it receives a difference payment or makes a repayment. The contract therefore affects revenues, not the physical delivery of electricity. A CfD also does not necessarily have to be a contract in the strict sense. In the British model, the generator concludes a private-law contract with the state-owned Low Carbon Contracts Company. In the German draft, by contrast, the payment obligation arises directly from the law, and towards the grid operator.

Why the instrument is used

The instrument is particularly important for plants with high investment costs and low marginal costs. These include wind and solar plants, run-of-river hydropower, geothermal energy and nuclear power. Their economic viability depends heavily on the cost of capital. The more reliably future revenues can be calculated, the cheaper financing can be. This can reduce the overall costs of new plants if tendering, competition and contract design work well. At the same time, the repayment side limits windfall profits in price crises such as 2022. This combination of investment security and a limit on high revenues is a key reason why the EU, with the 2024 electricity market reform, made the instrument the standard for certain types of support.

Legal framework in the EU

Regulation (EU) 2024/1747 inserted Article 19d into the Electricity Market Regulation (EU) 2019/943. Under it, direct price support for investments in new electricity generation plants must be designed as two-sided contracts for difference or as equivalent schemes with the same effect. This applies to wind and solar energy, geothermal energy, hydropower without a reservoir, and nuclear energy. The obligation applies only to contracts concluded from 17 July 2027. Participation in such schemes is voluntary. Investment grants, tax benefits, green electricity certificates and support for storage are not covered by this obligation. Independently of this, the European Commission reviews the design under State aid law. One example is its procedure concerning a planned French CfD model: there, it could not yet confirm that all design principles are complied with.

Under Article 19d and the Commission's guidance of December 2025, supported plants are to remain market-oriented. That is, they are to respond to price signals in a similar way to comparable plants without support. The Commission does not prescribe a specific type of CfD. The State must pass on to final customers the revenues from the clawback in accordance with Article 19d(5). Further rules concern the level of revenue hedging, penalties for early termination and possible exemptions for small plants.

Status in Germany

The current EEG 2023 uses the one-sided sliding market premium for supported direct marketing. The government draft for the EEG 2027 (Bundestag document 21/7867) retains the market premium in principle. However, it supplements it with a refinancing contribution under Section 21d. If the annual market value is above the applicable value, the operator pays the difference to the grid operator. The grid operator must actually collect this contribution. The result is a two-sided contract for difference linked to the quantity of electricity generated. According to the draft, it is to apply mainly to supported new plants of 100 kilowatts and above. As of the end of November 2026, the law has, according to available information, not yet been adopted. Details such as thresholds, exemptions and transitional periods may still change in the parliamentary procedure and through State aid approval. Existing plants are not affected.

Key design questions

  • Reference price: an hourly day-ahead price works differently from a monthly or annual average. In the British CfD system, a reference price is calculated from day-ahead data for each hour for weather-dependent technologies such as wind and solar. For baseload technologies, by contrast, a seasonal forward market price applies. Long averaging periods give the operator more incentive to market better than the average. However, they also leave it with more risk, for example through the cannibalisation effect, when many solar plants feed in at the same time and depress prices in those hours.

  • Volume basis: with the output-based CfD, every megawatt hour fed in is settled. This is easy to understand, but can reward feed-in even in unfavourable hours. Alternatives are models that are tied to the generation potential of a plant (capability CfD) or to a reference plant (yardstick CfD). There, the payment depends less on the individual operating decision.

  • Negative prices and curtailment: without special rules, feed-in could be worthwhile even when additional electricity burdens the system. Many models therefore suspend payments during periods of negative prices. In the German EEG, this already applies to the market premium under Section 51.

  • Use of the clawback revenues and counterparty: what matters is who handles the payments, who bears the default risk and how repayments are distributed. In the United Kingdom, payments to generators are financed through a levy on electricity suppliers. In the German draft, refinancing contributions flow via the grid operators to the EEG account.

Common misconceptions and limits

A two-sided contract for difference does not guarantee a low exchange price and is not a direct price cap for households. It determines how revenues are settled against a reference price. If market prices remain below the strike price over the long term, payments arise that have to be financed. If they are above it, repayments flow back. Whether consumers benefit depends on how these funds are passed on, on levy and charge rules, and on suppliers' procurement. The end-customer price also includes network charges, taxes and sales costs. Anyone who describes CfDs merely as a subsidy overlooks the repayment side. Anyone who describes them as an electricity price guarantee mixes up the wholesale and end-customer levels.

The function is also limited with regard to security of supply. A CfD can make it easier to build plants, but does not automatically provide firm capacity. Wind and solar plants generate depending on weather and time of day. Covering the residual load additionally requires storage, dispatchable power plants, grids and flexible demand. These are incentivised through separate instruments. How well a two-sided contract for difference works is decided not by its name, but by the specific rules: reference price, volume basis, settlement period, treatment of negative prices and institutional embedding. A well-designed model reduces investment risks without needlessly switching off market signals. A poorly designed model can devalue flexibility or shift costs in ways that are hard to see.