Zonal Pricing
Zonal pricing refers to an electricity market design in which a single wholesale electricity price is formed for a spatially delimited bidding zone. This price applies to all market participants within the zone, regardless of the grid node at which the electricity is generated or consumed. The usual price unit is euros per megawatt hour (€/MWh). The price therefore relates to delivered electrical energy (work), not to the installed capacity of a power plant and not to the grid state at a particular location.
Under EU law, the bidding zone is defined as the largest geographical area within which market participants can exchange energy without capacity allocation. Within the zone, therefore, no transmission capacity is allocated for trading. Cross-zonal capacity is allocated only for exchanges between zones. Under the Electricity Market Regulation (EU) 2019/943, bidding zones in a zonal electricity system are to provide correct locational price signals. They are to enable the greatest possible economic efficiency and as much cross-zonal trade as possible, without jeopardising security of supply.
The term is particularly important in European short-term trading. Both the day-ahead market and the intraday market are organised by bidding zones. Within a zone, buy and sell bids are matched at a single market price. If the available transmission capacity is not sufficient to deliver cheap electricity fully into a more expensive zone, the prices of the zones separate. This procedure is called market splitting.
Zonal pricing thus links two levels that are often treated separately in debates: price formation in the market and the physical limits of the electricity grid. Electricity does not flow along trade contracts but according to the laws of physics in the grid. A single price in a zone therefore does not mean that electricity can be transported without limits within that zone at all times. It only means that these limits are not mapped spatially in price formation.
Distinction from nodal prices and uniform retail prices
Zonal pricing differs from the nodal price model. There, prices arise at individual grid nodes or in very small grid areas. In addition to generation costs, each nodal price includes the local value of grid use, that is, congestion and losses. Several electricity markets in the USA use such models. They reflect grid constraints very precisely, but require a considerably more complex market organisation and produce many local prices.
In zonal pricing, many grid nodes are combined into one zone. Price signals thereby become simpler, because generators and consumers in wholesale trading do not have to take a separate price into account for every grid point. The drawback: congestion within the zone is initially not visible in the market outcome. Grid operators resolve it only afterwards, mainly through redispatch and countertrading. In Germany, the former feed-in management for renewable plants was transferred into Redispatch 2.0 in October 2021. EU law describes redispatch as a change in the generation or load pattern by grid operators in order to alleviate physical congestion.
Zonal pricing also does not mean that all customers pay the same electricity price. In addition to procurement costs, retail prices include network charges, taxes, levies, surcharges and sales costs. The zonal wholesale price is only one of these components. Households, commerce and industry therefore pay different prices even within the same bidding zone.
Likewise, zonal pricing is not the same as the pay-as-clear procedure. Pay-as-clear governs how a price arises from the bids: all successful bidders in a market area receive the same market-clearing price. Zonal pricing, by contrast, governs the area for which this price applies. Both rules often occur together but answer different questions.
Why the zone configuration determines price signals
The configuration of a bidding zone determines which grid congestion shows up in the market price and which is only resolved in grid operation. If a bottleneck lies between two zones, a price difference can arise: electricity is then cheaper on one side and more expensive on the other. This difference shows that additional transmission capacity would be economically valuable. It also shows that local generation, flexible demand or storage can be particularly useful on the more expensive side.
If the same bottleneck lies within a zone, initially no price difference arises. The market calculates as if electricity could flow freely within the zone. If this is not physically possible, grid operators must intervene after market closure. A simplified example: a lot of wind power in the north is sold, but the lines to the south are fully loaded. Grid operators then ramp down plants before the bottleneck and ramp up power plants behind it. The costs for this do not appear in the zonal market price. They are distributed through other channels, in Germany essentially through network charges.
The zone configuration thus also influences how costs and revenues are distributed. A large uniform zone can increase liquidity, simplify trading and smooth out price differences between regions. At the same time, it can favour locations whose generation appears cheap in the market but regularly causes congestion. Smaller zones make congestion more visible in the price. However, they increase the number of price areas and change hedging strategies, investment signals and political distribution issues.
Congestion management within and between zones
In the European electricity market, the transmission system operators, in cooperation with regional coordination centres, determine the cross-zonal capacities and feed them into market coupling. In flow-based capacity calculation, physical load flows and critical network elements are taken into account. According to EU law, such elements can lie within a bidding zone or between zones. The market exchanges energy between the zones to the extent that the calculated capacities allow. If they are insufficient, different zonal prices form.
Within a zone, generation and consumption receive the same price in wholesale trading, even if the grid is heavily loaded locally. Grid operators subsequently ensure grid security through operational measures. Redispatch is not a market failure in the narrow sense here, but follows from the chosen division of labour: the market optimises the bids within the zone, and grid operation corrects what is physically not feasible.
This division of labour works well as long as internal congestion is rare, small or cheap to resolve. It becomes problematic with structural congestion. EU law understands this to mean congestion that is clearly identifiable, predictable, geographically stable over time and frequently occurring under normal conditions. In such cases, the market price permanently provides signals that are too coarse. Generators, storage, electrolysers, industrial plants or charging infrastructure then do not necessarily receive the locational incentive that would make sense from the grid's perspective. The costs of the corrections appear elsewhere, often in the network charge.
Legal framework in the EU and status in Germany
Under Article 14 of Regulation (EU) 2019/943, the configuration of bidding zones is reviewed in a coordinated procedure, the bidding zone review. All structural congestion is identified and alternative zone configurations are analysed. If a Member State identifies structural congestion, it can change its zone configuration or pursue an action plan to reduce the congestion. An action plan must ensure that the minimum requirements for cross-zonal trading capacity are met. This requirement is known as the 70 per cent rule. No state can decide on a change of bidding zones alone. The Member States concerned must agree. If they fail to do so, the European Commission decides.
Germany and Luxembourg together form one bidding zone. In April 2025, ENTSO-E presented the bidding zone review report with target year 2025. For Central Europe, the simulation showed the highest economic efficiency with a split of Germany-Luxembourg into five zones. The calculated efficiency gain was around 339 million euros for the target year 2025. However, ENTSO-E itself pointed to methodological limitations and outdated input data. The association did not consider the simulation results alone to be a sufficient basis for a decision.
In December 2025, the German federal government published a new bidding zone action plan and submitted it to the European Commission. In it, it maintains the uniform German-Luxembourg bidding zone. Instead of a split, the plan relies on measures against grid congestion, including grid expansion, better congestion management and better coordination of grid, generation, consumption and storage. It is also intended to ensure that the European minimum trading capacities are met. According to the sources reviewed, no decision on a new configuration of the German bidding zone has been made as of the end of November 2026. The political debate on this continues, however.
Typical misunderstandings
-
Zonal pricing is not a purely technical question. Grid physics sets limits, but the configuration of a bidding zone is determined institutionally. It depends on European law, national responsibilities, market liquidity, security of supply, competition and political distribution issues. A zone is therefore neither a natural grid region nor a purely market decision.
-
A larger zone is not automatically more efficient. Size can facilitate trading and increase liquidity. However, if the internal grid structure frequently cannot support the market outcomes, additional correction costs arise. These costs do not disappear through the single price; they are merely distributed differently.
-
A split into several zones does not automatically reduce total costs. It can make congestion more transparent and improve investment signals. But it can also make hedging more expensive, reduce liquidity and make regional price differences more politically visible. The outcome depends on how often congestion occurs, how much flexibility is available, how quickly grids are expanded and how strongly market participants respond to spatial price signals.
-
"Electricity price zone" usually means the wholesale bidding zone and not an area in which all electricity costs are the same. A low exchange price in a zone does not necessarily mean low retail prices. A high zonal price does not automatically mean that electricity is scarce. It can also reflect grid constraints, low available generation or high demand in the period concerned.
Significance for the energy transition, flexibility and investment
The more weather-dependent generation there is in the system, the more important zonal pricing becomes. Wind power is often generated far from the large consumption centres. Photovoltaics, storage, heat pumps, electromobility and the electrification of industry change load flows and consumption profiles. If the zone reflects these spatial differences only roughly, grid planning, congestion management and flexibility gain in importance.
For investors, the zonal price is a central revenue signal. A wind farm, a battery storage system or an electrolyser is assessed not only on technical costs but also on expected market prices, grid connection conditions and possible curtailment. If a location is frequently affected by congestion without the zonal price showing this, private profitability and the grid burden for the national economy can diverge. A possible change in the zone configuration is also a separate risk for investors. EU law therefore requires, for example, that power purchase agreements (PPAs) specify the delivery zone and regulate who hedges the cross-zonal transmission rights in the event of a zone change.
Similar considerations apply to consumers with controllable demand. Flexible loads are particularly useful where they avoid congestion or absorb locally generated electricity. A single zonal price creates only limited spatial incentives for this. Instruments such as time-variable or regionally differentiated network charges, local flexibility markets or grid-oriented control are intended to close this gap. However, they must fit with the rules of wholesale trading and with the responsibilities of grid operators.
Zonal pricing shows that electricity market prices are organised spatially. The configuration of the zone determines whether a grid bottleneck becomes visible in the market as a price difference or is only corrected later in grid operation. The term therefore describes not only a pricing rule but the boundary between market coordination and grid responsibility. Within the zone a common price applies; between zones a congestion signal can arise. Anyone assessing zonal prices should disclose which costs and incentives become visible as a result and which remain hidden.
Sources
- Verordnung (EU) 2019/943 über den Elektrizitätsbinnenmarkt (Neufassung), konsolidierte Fassung vom 16.07.2024 — Europäische Union, EUR-Lex; 2024-07-16 (konsolidierte Fassung; Grundverordnung vom 5.6.2019). Art. 2 Nr. 4, 6, 26, 27, 65, 69, 77; Erwägungsgründe zur Festlegung der Gebotszonen; Art. 14 bis 16
- ENTSO-E Main Report: Bidding Zone Review of the 2025 Target Year — ENTSO-E; 2025-04 (Veröffentlichung 28.04.2025). Zusammenfassung und Kapitel zur Region Central Europe
- Bidding Zone Action Plan (Aktionsplan Gebotszone) — Bundesministerium für Wirtschaft und Energie; 2025-12 (laut Berichterstattung veröffentlicht um den 15.–18.12.2025). Abschnitte 1.2 und 1.3
- Wie teilt man eine Stromgebotszone? Ariadne-Hintergrund — Kopernikus-Projekt Ariadne; 2026-08. Abschnitte zu Verfahren und Aktionsplan
Related glossary entries
- bidding zone
- day-ahead market
- intraday market
- market splitting
- redispatch
- pay-as-clear
- transmission system operators
- flow-based capacity calculation
- network charge
- bidding zone review
- grid expansion
- congestion management
- flexibility